Main Facts

Investor: Seibu Giken DST Poland Sp. z o. o.
Performed works: earthworks, foundation works, steel structure, substructures for floors, performing a roof, performing the electric, gas, sanitary, wod-kan, c.o. and c.t. installation, mounting the facade, outdoor lighting
Implementation time: March 2019-October 2019

Implementation description:

The investment was implemented in collaboration with our long-term partner P.U.H PSB Paweł Święcki, consisting in the construction of the assembly hall and an office-social part for Seibu Giken DST, which is a Swedish producer of adsorption dehumidifiers. As part of the investment located in Chwaszczyno nearby Gdynia, GIGA and PSB carried out a complete scope of works as a general contractor in accordance with the obtained detailed documentation, handing over the facility holding an occupancy permit. As part of this task, also sites surrounding the building and access routes to the public road were performed. A newly-erected building consists of the assembly hall covering in total ca. 2800m2 and an office part with the total area of ca. 500 m2.

Zamknij